New cable bridge being constructed at Branch Mouth

vlcsnap-2018-01-10-14h38m56s106The old pedestrian crossing at Branch Mouth in the Cayo District is being replaced with a new cable bridge. GOB says that the new bridge has a greater loading capacity and has been elevated to accommodate a higher flood level. Works include installing all runners on the decking platform, aligning the cable suspenders and decking platform, and installing a chain-link railing to enhance protection for all users. It is expected that the Branch Mouth Cable Bridge will be completed in the next seven working days.

About the Author